Наверх

Transneft Central Siberia JSC Fulfills Scheduled Repairs at Oil Trunk Pipeline

Date of publication: 15 December 2017 Print

Transneft Central Siberia JSC conducted scheduled repairs in Aleksandrovskoye – Ahznero-Sudzhensk oil trunk pipeline (OTP)

Connection of the passage over the small water flow, the Murashka River, was performed at Aleksandrovskoye – Anzhero-Sudzhensk OTP, after a pipe portion replacement. During the scheduled downtime of OTP, seven defects in the linear portion of OTP were eliminated.

The repairs teams of the three Transneft Central Siberia JSC’s regional oil pipeline directorates – Tomsk, Strezhevoy, and Parabel – were engaged in thcomprehensive work intended to ensure the oil pipeline network reliability.

All work as been perfored as part of the comprehensive program of technical upgrading, revamping and overhaul of OTP facilities for 2017.

Oil transportation via Aleksandrovskoye – Anzhero-Sudzhensk oil trunk pipeline was resumed according to the schedule, in routine mode.